Project Description:
DELTA Group is considered as the leading contractor in the construction of the tunnel and is one of the top five construction companies in Vietnam in the civil and industrial construction industry.
End User: Delta Construction Group
Configurations
| System | Type of Model | Name of Model | Qty |
| Entrance System | Swing Barrier | SBTL2000 | 1 |
| SBTL2200 | 1 | ||
| Tripod Turnstile | TS2100 | 1 |
Technical Feature / Solution
Photo Gallery
Shopping Cart
Project Consultation
Online Consultation
Back to Top